Skip to main content

David Way Pump Station

The David Way Pump Station, constructed in 1969, has exceeded its life expectancy and is badly deteriorated.  The pump station currently serves treated water to 93 properties with a single pump for both domestic demands and fire flows.   The existing fire flow capabilities are inadequate and the system lacks a back-up pump.  

The project entails replacing the pump station and generator with a pre-manufactured pump station that includes two standard flow pumps and a separate fire flow pump.  The new pump station and generator will provide system redundancy and better system reliability.

The pump station and generator were delivered to the site on March 17, 2022.  NID Maintenance crews will  connect the pump station to the new foundation and piping.

 

Project location map

David Way Pump Station Installation
Crews installing the new David Way Pump Station 
Join our mailing list