Lower Cascade Canal Final EIR

Project Documents | FERC Relicensing | Strategic Plan | Master Plan | Budgets

The Final Environmental Impact Report and Engineer’s Report for the Lower Cascade Canal - Banner/Cascade Pipeline Project are available for review.

The Final Environmental Impact Report and Engineer’s Report can be accessed by clicking on the links below. The documents are provided in Adobe Acrobat PDF format.

Final EIR Document

Revisions to FEIR Document

Complete FEIR Document (Large Download)

Please note: A draft of the Mitigation Monitoring and Reporting Plan is also included.

Partial FEIR Documents (Smaller Downloads)

Engineer’s Report

The Engineer’s Report for the Lower Cascade Canal/Banner-Cascade Pipeline Project is available for review. The report provides cost estimates and project recommendation based on the Final EIR as released in December 2006. The report may be accessed by clicking on the link below, the document is provided in Adobe Acrobat PDF format.

The Nevada Irrigation District Board authorized the issue of a Revised Draft Environmental Impact Report for the Lower Cascade Canal - Banner / Cascade Pipeline Project on March 22, 2006.

The Report was released for a 60 day public review period on March 31, 2006. The comment period ended May 30, 2006.

Draft EIR Document

The Revised Draft Environmental Impact Report can be accessed below by clicking on the appropriate links. The documents are provided in Adobe Acrobat .pdf format.

Appendices