

The Final Environmental Impact Report and Engineer’s Report for the Lower Cascade Canal - Banner/Cascade Pipeline Project are available for review.
The Final Environmental Impact Report and Engineer’s Report can be accessed by clicking on the links below. The documents are provided in Adobe Acrobat PDF format.
Revisions to FEIR Document
(296 KB)
(56 KB)
(620 KB) Complete FEIR Document (Large Download)
(106 MB) Please note: A draft of the Mitigation Monitoring and Reporting Plan is also included.
Partial FEIR Documents (Smaller Downloads)
(24 MB)
(35 MB)
(21 MB)
(26 MB) The Engineer’s Report for the Lower Cascade Canal/Banner-Cascade Pipeline Project is available for review. The report provides cost estimates and project recommendation based on the Final EIR as released in December 2006. The report may be accessed by clicking on the link below, the document is provided in Adobe Acrobat PDF format.
(204 KB) The Nevada Irrigation District Board authorized the issue of a Revised Draft Environmental Impact Report for the Lower Cascade Canal - Banner / Cascade Pipeline Project on March 22, 2006.
The Report was released for a 60 day public review period on March 31, 2006. The comment period ended May 30, 2006.
The Revised Draft Environmental Impact Report can be accessed below by clicking on the appropriate links. The documents are provided in Adobe Acrobat .pdf format.
(228 KB)
(28 KB)
(6 MB)
(6 MB)
(29 MB)
(12 MB)
(8 KB)
(16 KB)
(12 KB)
(24 KB)
(9 MB)
(292 KB)
(532 KB)
(3 MB)
(6 MB)
(916 KB)
(172 KB)
(1 MB)
(7 MB)
(4 MB)
(176 KB)
(9 MB)
(52 KB)
(80 KB)
(12 KB)
(124 KB)
(32 KB)
(120 KB)
(16 KB)
(36 KB)
(52 KB)
(72 KB)
(28 KB) Appendices